Vulnerabilities (CVE)

Filtered by vendor Critical Path Subscribe
Filtered by product Livecontent Directory
Total 2 CVE
CVE Vendors Products Updated CVSS v2 CVSS v3
CVE-2001-1315 1 Critical Path 2 Injoin Directory Server, Livecontent Directory 2026-06-16 7.5 HIGH N/A
Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite.
CVE-2001-1314 1 Critical Path 2 Injoin Directory Server, Livecontent Directory 2026-06-16 7.5 HIGH N/A
Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite.